GEOIZOL expertise is in demand at building roads in the conditions of weak soils in the Arkhangelsk region
Ivan Bogdanov, Chief Designer of GEOIZOL Project (part of the GEOIZOL Group of Companies), took part in a video conference on the problems of stabilizing the base of the roadbed of the Arkhangelsk region in weak soils condition. The event was organized by the St. Petersburg Committee for Arctic Affairs.
Start of works on crushed stone piles construction
The construction of crushed stone piles (technology for improving soil characteristics) has started in the development area of the Bely Ostrov residential complex at the address: Beloostrovskaya str., 9. GEOIZOL Project designers suggested the construction of crushed stone reinforcing elements with a diameter of 800 mm. This technology will provide the necessary characteristics for weak foundation soils. The foundation on solid ground is the key to the reliability and durability of the entire complex of buildings.
Online geotechnical monitoring
During the construction of the Grand House residential complex underground cycle in the historical center of St. Petersburg (Telezhnaya street), specialists of GEOIZOL Project company together with GPIKO company organized online geotechnical monitoring of the construction site.
Training of GEOIZOL Project specialists
GEOIZOL Project engineers completed a course (Moscow) ” Theoretical foundations and practical methods of laboratory definitions of input parameters of computational models of software systems based on the finite element method. PLAXIS software package”. The training included four sessions where specialists learned how to obtain the necessary soil parameters for various models of software systems, as well as how to correctly apply these parameters in the PLAXIS program. At the end of the seminars, GEOIZOL Project specialists answered the questions of the GeoInfo editorial board.
Glavgosexpertiza of Russia approved the project of the final section of the Tavrida Federal highway
Glavgosexpertiza experts approved the project of the eighth section of the Tavrida highway leading to Sevastopol, according to the data of the unified state register of expert reports for the design documentation of capital construction projects.
SKIUNION EXPO 360° in Sochi
Among the functional purposes of the GEOIZOL-MP system, we can distinguish its use as anchor system, soil nail, bored pile, and enclosing structure.
On December 24, a special event in the honor of the 100th anniversary of the Pushkin Machine-Building Plant (a part of the GEOIZOL Group of Companies) was held at the Tsarskoselsky Youth House.
On December 24, a special event in the honor of the 100th anniversary of the Pushkin Machine-Building Plant (a part of the GEOIZOL Group of Companies) was held at the Tsarskoselsky Youth House.
Experience in the use of nail structures presented in St. Petersburg
More than 60% of Russia’s territory is located in permafrost and swamp areas. Nevertheless, in the coming decades, the territory of the Far North is going to face large-scale transport development, including the construction of railways.
New promenade opened in Svetlogorsk
By the beginning of the resort season in Svetlogorsk, Kaliningrad region, a significant object for the city was opened. Ant that is a promenade on the embankment along the Baltic Sea.